How we work

A design agreement first. A build agreement second.

Design is its own piece of work, with its own fee and its own end: a set of documents you can hold.

Only then is there something real to price. The build agreement is written against the finished drawings, so the price describes the house you chose. You can stop between the two. Starting to design does not commit you to building.

Why two agreements

  • Design is agreed, scoped and signed on its own

  • The drawings and specifications are yours at the end

  • The build agreement is written from finished drawings

  • You decide at the line between them, with the full picture

Rolled plans and an architect's scale ruler on a workbench

Agreement one

The design agreement, stage by stage

From the first visit to the last drawing. Each stage ends with something on paper.

The design agreement, stage by stage
StageUsYou leave withYou
Survey and briefUsMeasure the house and the land, and write down what we heardYou leave withA measured survey and a written briefYouShow us the house, and tell us what is not working
ConceptUsDraw two or three plans and build a model of the one you favorYou leave withA chosen plan, with the reasons beside itYouChoose between the options and say what is missing
SelectionsUsSet out materials, fixtures and hardware room by roomYou leave withA selections book for every roomYouVisit the sample table and choose finishes
EngineeringUsCoordinate the structural, mechanical and electrical drawingsYou leave withDrawings that show how the house stands upYouReview the structure and the systems in plain words
The final setUsIssue the drawings and specifications, and file for permitsYou leave withA full set of documents that are yours to keepYouRead it, question it and sign it off

Agreement two

The build agreement, stage by stage

Written only once the drawings are finished. Each stage says who does what and what you can hold us to.

The build agreement, stage by stage
StageUsYou leave withYou
Price and scheduleUsPrice the finished drawings and write the weeks inYou leave withA build agreement, line by lineYouRead the scope, the allowances and the schedule
PreparationUsProtect floors and furniture, set dust walls, order what has a long waitYou leave withA site that is ready on day oneYouDecide where you will be during the work
ConstructionUsBuild the house, and photograph each stage before it is coveredYou leave withA weekly note and photographs of what is in the wallsYouMeet weekly, and make the decisions that come up
ChangesUsWrite the change down, with its schedule and price effect, before building itYou leave withA signed page for every changeYouAsk for what you want to change, at any point
HandoverUsFinish the punch list, then hand over the records and the terms for repairs after handoverYou leave withThe house, and a binder of how it was builtYouWalk the house with us, room by room

Week one on site

What happens in the first week of building

Before the first wall comes down, the house is protected. This is the order we do it in, and who is there.

  1. 01

    Step 1: Monday: we protect the house

    Reza Hamdan, the site superintendent, lays floor protection along a clean route, masks doors and sets dust walls. Nothing is opened until this is done.

  2. 02

    Step 2: Tuesday: we shut off and mark

    We shut off the water and power to the work area only, mark what stays and what goes, and photograph every wall before it is touched.

  3. 03

    Step 3: Wednesday: we walk it with you

    Jing Cheung, your project lead, walks the site with you. You see the layout marked out in tape, and tell us what feels wrong while it is cheap to change.

  4. 04

    Step 4: Thursday: demolition begins

    Careful work, by hand where the house asks for it. What is found behind the walls is photographed and sent to you the same day.

  5. 05

    Step 5: Friday: the first weekly meeting

    We go through what was found, what was decided and what comes next week. You get it in writing by that evening.