Whole-house renovation

Whole-house renovation

Walls move, systems are renewed and the house is made to work for the way you live now, with its character kept.

A whole-house renovation begins with a survey of what the house is, behind the plaster as well as in front of it. The design agreement turns that survey and your brief into a plan of every room, the structure that holds it up and the systems inside it. The build agreement prices that plan.

What the design agreement covers

  • A measured survey of the house and the site

  • Plans, elevations and sections of every floor

  • Structural, mechanical and electrical coordination

  • Materials, fixtures and finishes, room by room

  • Drawings for the town and for pricing

Blue ranch house with a covered porch glowing at dusk, with a lawn in front

What shapes the project

Four things set the shape of the project

  • The age and condition of the house

    What is behind the plaster, how the framing has settled, what the wiring is. We open a few places during design, with your permission, to see.

  • How much moves

    Moving a kitchen, a stair or a bathroom moves plumbing, ductwork and structure with it. We show you the consequence of each move on paper.

  • Where you live meanwhile

    Some houses can be lived in during the work and many can't. We decide it during design, together, not in the first week.

  • Reviews and permits

    Town zoning and building review, and near the water, coastal and wetlands rules. We tell you which apply to your lot.

How it goes

The work, in order

  1. 01

    Step 1: Survey and brief

    We measure the house, open the places that matter and write down what you want.

  2. 02

    Step 2: Design and engineering

    Concept options, a chosen plan, then full drawings with the engineers.

  3. 03

    Step 3: Permits and pricing

    We file the drawings, and price the finished set into a build agreement.

  4. 04

    Step 4: Construction

    Protection first, then the work in a written order, with a weekly meeting.

  5. 05

    Step 5: Handover

    A walk through every room, the records, and a plain statement of what we repair afterward.

Examples

Sample photographs, scope beside each

Kitchen with white cabinets, a green tile backsplash and a wood floor
Kitchen: layout moved to the back of the house
White kitchen with a butcher block peninsula open to the living room
Kitchen and living room: one wall removed, beam hidden
White kitchen with an island, a wood-look floor and a staircase beyond
Ground floor: kitchen, hall and stair planned as one

Sample photos.

Questions

Questions about this work

Do we have to move out?

It depends on the work. A kitchen or a bath can usually be built with the house lived in, behind dust walls and a protected route. A whole-house renovation often can't. We plan this during design, so the decision is made on paper, not in week one.

Who handles permits?

We prepare the drawings and the application, and we deal with the building department. You sign where the town requires the owner's signature. Near the water, or in a historic district, other reviews can apply, and we tell you which during design.

Our house was built before 1978. Does that change how you work?

Yes. Federal rules for homes built before 1978 require a renovation firm to be EPA certified and to use lead-safe work practices wherever paint will be disturbed. Our certificate is listed on the licenses page, and we give you the EPA's renovation pamphlet before work begins. Minor repairs under 6 square feet inside or 20 square feet outside are exempt, but window replacement and demolition are always covered.

What happens when something changes mid-project?

It is written down before it is built. A change has a page that says what changes, what it does to the schedule and what it does to the price, and work on it starts once you have signed.

Next step

Tell us about the house.

Describe what it is, what's not working and what you hope for. We will tell you what a whole-house project involves.