Skip to content
We start a few design agreements each season. Ask about the next opening.
Monday – Friday: 8 a.m. – 5 p.m.Home Improvement Contractor · CT HIC. 000000VerifyArchitect · CT ARC. 000000VerifyLead-Safe Certified Firm (RRP) · US Certificate 000000General liability and workers' compensation
3 more licenses
  • Home Improvement Contractor · CT HIC. 000000Verify
  • Architect · CT ARC. 000000Verify
  • Lead-Safe Certified Firm (RRP) · US Certificate 000000
  • General liability and workers' compensation
(203) 555-0104

Primary suites and baths

Primary suites and baths

Bedroom, closets and bath designed together, with the plumbing planned behind the tile.

The best bathrooms are won or lost behind the tile. The design agreement draws the whole suite, then the plumbing, waterproofing, heating and ventilation that keep it working for decades. The finishes you see are chosen with the hidden parts already settled.

What the design agreement covers

  • A plan of the whole suite: bedroom, closets and bath

  • Plumbing, drain and venting layout

  • Waterproofing and heating details

  • Tile, stone, fixtures and hardware

  • Lighting, mirrors and millwork

Freestanding tub with a black floor-mounted faucet under a double-hung window

What shapes the project

Four things set the shape of the project

  • Plumbing moves

    Moving a tub or a shower means moving drains, and sometimes structure. We draw it before you fall for a plan that needs it.

  • Waterproofing

    The membrane behind the tile is the part you can never see again. We specify it, and photograph it before it is covered.

  • Heat and air

    Radiant floors, a quiet exhaust fan and a window that opens. Comfort is drawn in design, not added at the end.

  • Stone and tile

    Large slabs and small mosaics need different substrates and different schedules, and both can be backordered.

How it goes

The work, in order

  1. 01

    Step 1: Brief and plan

    We look at how the suite is used in the morning and at night, then draw it.

  2. 02

    Step 2: Selections

    Tile, stone, fixtures and hardware, chosen at the sample table.

  3. 03

    Step 3: Pricing and ordering

    A build agreement and the stone and fixtures ordered early.

  4. 04

    Step 4: Construction

    Demolition, rough plumbing, waterproofing, tile and finish, in that order.

  5. 05

    Step 5: Handover

    A walk-through, the fixtures' manuals and the terms for repairs afterward.

Examples

Sample photographs, scope beside each

Freestanding tub with a brass floor-mounted faucet beside a double-hung window
Bath: freestanding tub, brass fixtures, window kept
Bathroom with a freestanding tub, black fixtures and a glass shower beside double-hung windows
Primary bath: wet area behind glass, tub by the windows
Walk-in shower with marble-look tile, a built-in bench and frameless glass
Shower: marble tile, bench, frameless glass

Sample photos.

Questions

Questions about this work

Can you add a bathroom where there isn't one?

Often, yes. It depends on where the drains and vents can run and what the floor structure allows. We check during the survey, so you know before you plan around it.

Do you build with the house lived in?

Yes, for a bath or a suite. You lose that bathroom for the work, so we agree early where you will wash in the meantime.

Who handles permits?

We prepare the drawings and the application, and we deal with the building department. You sign where the town requires the owner's signature. Near the water, or in a historic district, other reviews can apply, and we tell you which during design.

Our house was built before 1978. Does that change how you work?

Yes. Federal rules for homes built before 1978 require a renovation firm to be EPA certified and to use lead-safe work practices wherever paint will be disturbed. Our certificate is listed on the licenses page, and we give you the EPA's renovation pamphlet before work begins. Minor repairs under 6 square feet inside or 20 square feet outside are exempt, but window replacement and demolition are always covered.

Next step

Planning a suite or a bath?

Tell us what you have now and what you would change. We will say how design would go.