Skip to content
We start a few design agreements each season. Ask about the next opening.
Monday – Friday: 8 a.m. – 5 p.m.Home Improvement Contractor · CT HIC. 000000VerifyArchitect · CT ARC. 000000VerifyLead-Safe Certified Firm (RRP) · US Certificate 000000General liability and workers' compensation
3 more licenses
  • Home Improvement Contractor · CT HIC. 000000Verify
  • Architect · CT ARC. 000000Verify
  • Lead-Safe Certified Firm (RRP) · US Certificate 000000
  • General liability and workers' compensation
(203) 555-0104

Second homes and seasonal houses

Second homes and seasonal houses

Built around your calendar, with decisions and photographs that reach you wherever you are.

You are not at the house on Tuesday, and neither is your decision-making. A second-home project works when the information comes to you: a weekly note, photographs of each stage before it is covered, and a written page for every choice. We plan the work around the seasons the house is used, and the winter it isn't.

What we set up with you

  • A standing weekly call at a time that suits you

  • Photographs of each stage, sent as they are taken

  • Decisions by email, each written on a signed page

  • A plan for who holds keys and who may enter

  • A schedule built around the seasons you use the house

Weathered gray shingle cottage and sheds along a gravel lane toward the shore

What shapes the project

Four things set the shape of the project

  • Your calendar

    The months you want the house back, and the months you can stay away. We build the schedule from that, not the other way.

  • Winter

    A house closed for the cold needs its heating, water and openings planned. We draw the winter before the first board is cut.

  • Decisions at a distance

    Every choice is shown with the sample, the drawing and the effect on the schedule, then confirmed in writing.

  • Access and security

    Who has keys, who sets the alarm and who is in the house when you are not. This is agreed in the build agreement.

How it goes

The work, in order

  1. 01

    Step 1: Survey and brief

    We visit when it suits you, and write down how the house is used.

  2. 02

    Step 2: Design

    Drawings and selections, reviewed on calls and in person on your weekends.

  3. 03

    Step 3: Permits and pricing

    Filed with the town, then priced into a build agreement.

  4. 04

    Step 4: Construction

    A weekly note on Thursday, a call on Friday, and photographs between.

  5. 05

    Step 5: Handover

    A walk through, then a plan for opening and closing the house each year.

Examples

Sample photographs, scope beside each

Wooden rocking chair on a painted porch with a white railing looking over a green yard
Porch: restored floor, new railing, painted to match
Wooden rocking chair on a porch beside a log wall and a flowering bush
Porch: new boards laid beside the original logs
Kitchen under renovation with wood cabinets, an island and floor protection
Kitchen in progress: floors protected, cabinets set

Sample photos.

Questions

Questions about this work

Can I make decisions without being there?

Yes. Every decision comes with the sample, the drawing and what it does to the schedule. You confirm it in writing, and we proceed once it is signed.

What about the house when it's empty?

We agree in the build agreement who holds keys, who is allowed in and how the house is secured at night and on weekends.

Who handles permits?

We prepare the drawings and the application, and we deal with the building department. You sign where the town requires the owner's signature. Near the water, or in a historic district, other reviews can apply, and we tell you which during design.

Do you work outside Greenwich?

Yes, across Fairfield County and in the Litchfield County hill towns, for homeowners and for second-home owners. The full list is on the service area page. We work in Connecticut only.

Next step

A house you visit, not live in?

Tell us where it is and how you use it. We will say how a project would work around your calendar.